Masana Energy Solutions HSS Customer Guide

Organisational measures to prevent/limit release from site: Do not apply industrial sludge to natural soils. Sewage sludge should be incinerated, contained or reclaimed. Conditions and measures related to sewage treatment plant: Not applicable as there is no release to wastewater. Conditions and measures related to external treatment of waste for disposal: During manufacturing, no waste of the substance is generated. Conditions and measures related to external recovery of waste: During manufacturing, no waste of the substance is generated. Estimated substance removal from wastewater via on-site sewage treatment EC number ... % | EC number ... % 265-045-2 … 95.1 | 265-082-4 … 87.6 265-058-3 … 90.4 | 269-777-3 … 94.0 265-064-6 … 92.5 | 270-675-6 … 94.2 265-076-1 … 92.7 | 273-263-4 … 94.0 265-081-9 … 93.9 | 295-511-0 … 93.2 Total efficiency of removal from wastewater after on-site and off-site (municipal treatment plant) RMMs EC number ... % | EC number ... % 265-045-2 … 95.1 | 265-082-4 … 87.6 265-058-3 … 90.4 | 269-777-3 … 94.0 265-064-6 … 92.5 | 270-675-6 … 94.2 265-076-1 … 98.3 | 273-263-4 … 99.0 265-081-9 … 93.9 | 295-511-0 … 99.4 Maximum allowable site tonnage (M Safe ) based on release following total wastewater treatment removal EC number ... kg/day | EC number ... kg/day 265-045-2 … 1.9E+07 | 265-082-4 … 3.5E+06 265-058-3 … 9.2E+06 | 269-777-3 … 2.0E+07 265-064-6 … 3.6E+05 | 270-675-6 … 1.7E+07 265-076-1 … 1.5E+06 | 273-263-4 … 7.4E+05 265-081-9 … 7.4E+06 | 295-511-0 … 4.3E+05 Assumed on-site sewage treatment plant flow 1.0E+04 (m3/d) EC number ... Value | EC number ... Value 265-045-2 … 3.5E-01 | 265-082-4 … 1.8E-01 265-058-3 … 8.0E-01 | 269-777-3 … 5.4E-01 265-064-6 … 1.3E-01 | 270-675-6 … 6.9E-01 265-076-1 … 3.4E-01 | 273-263-4 … 2.2E-01 265-081-9 … 9.0E-01 | 295-511-0 … 4.7E-01 typical value: 9.1E-01 EC number ... Value 265-058-3 ... 2.8E-01 269-777-3 ... 4.2E-01 RCR - Air Compartment Driven: RCR - Water Compartment Driven: Section 3: Exposure estimation and reference to its source Exposure assessment (environment): Hydrocarbon Block Method (Petrorisk) Exposure assessment (human): The ECETOC TRA tool has been used to estimate workplace exposures unless otherwise indicated. Exposure estimation and reference to its source - Workers Exposure estimation and reference to its source - Environment Section 4: Guidance to check compliance with the exposure scenario Environment Guidance is based on assumed operating conditions which may not be applicable to all sites; thus, scaling may be necessary to define appropriate site-specific risk management measures. Required removal efficiency for wastewater can be achieved using onsite/ offsite technologies, either alone or in combination. Required removal efficiency for air can be achieved using on-site technologies, either alone or in combination. Further details on scaling and control technologies are provided in SPERC factsheet. Health Predicted exposures are not expected to exceed the DN(M)EL when the risk management measures/operational conditions outlined in section 2 are implemented. Where other risk management measures/operational conditions are adopted, then users should ensure that risks are managed to at least equivalent levels. 36/38 Manufacture (Heavy fuel oil) - Industrial Fuel Oil, residual

RkJQdWJsaXNoZXIy MTI4MTE=